A little bit of work needs to be done to the top of the kiln. Will be putting a layer of brick around the flue holes first. Then I was thinking about putting down an inch layer of fiber over the arch. Not sure yet but I have bunches of broken up IFBs and was considering covering the fiber, to the left and right of the damper, with that and evening it out to the top of kiln.
Finishing Day
-
Yesterday was finishing day in the studio: trimming & slip trialing bowls.
6 days ago
No comments:
Post a Comment